Murray City, Utah There's More to Murray

Go To Search
home
print pagerss
Road Construction Projects
Murray Projects List

Projects for 2015/Click links below for additional information:

5900 South from Main Street to 725 East (Final Asphalt and Striping)

5900S from State Street to 700 West (Gas Line, Water, Storm Drain and Road Improvements)

Jamiah (Storm Drain and Road Improvements)

5235 South; 1045 East to Wesley (Complete Reconstruction)

1865 East and Zenda Way (Asphalt Overlay and Concrete Repairs)

Vine Street; Cottonwood Street to 900 East (Surface Maintenance and Bike Lane Striping)

Winchester Street; 1300 West to Cottonwood Street (Bike Lane Striping)

Sidewalks (Repair Trip Hazards in Neighborhoods West of State Street)

City Wide (Asphalt Patchwork, Crack Sealing and General Maintenance)

Chevy Chase Area (JVWCD Water Line Replacement)

Paradise Park Area (JVWCD Water Line Replacement)

 UDOT Construction Projects  




HomeContact UsSitemap AccessibilityCopyright NoticesPowered by CivicPlus
Murray City Hall  •  5025 South State Street  •  Murray, UT 84107